Showing posts with label iver. Show all posts
Showing posts with label iver. Show all posts

Wednesday, June 23, 2010

Day 5 - IVER Mission Planning

After the experiments of the day before, including a full grid run at the surface, we decided to make the mission grid a little smaller. This was done to keep the IVER farther away from the shore and minimize the risk to the IVER. We set the IVER to undulate between the surface and 10 meters (30 feet) or 12.192 meters (40 feet) in order to gather dissolved oxygen data as deep as possible. This was the most ambitious mission that our IVER has been sent on yet in terms of depth! And it performed admirably each time! The OceanServer software predicted that the mission would last 50 minutes, but it turned out to last about 65 minutes each time it was completed.
IVER Undulating MissionMap of IVER's Undulating Mission

Today's testing was very successful, but didn't come without a little excitement. In the middle of a mission the head of the field station came speeding down in his car to our test site and shouted to Kasper in Norwegian. While none of us understood what was being communicated, Kasper definitely did, as he took off running towards the field station. As we came to find out later, Kasper's lab experiment unfortunately got a little hot, as the projector being used to provide light to the water samples overheated and began smoking. This was an unfortunate setback but KAsper, as usual, carried on with his cheerful and kind attitude. Below is a picture of the experiment...before the accident.


Kasper in the lab taking O2 readings. Projector is on the left.

During the next mission we were able to escape for quick hike up the closest mountain. All of us had been eager to hike, and we finally got the change. Fifteen minutes later we found ourselves at the top with a spectacular view of the bay and the Trondheim fjord. Below are some of the pictures taken.

Part of the group making their way to the top.

View from above of the dock, tent, Jane, and field station.

When we returned we found Jane looking comfy on our local rock. A good book, beautiful view, and comfortable rock....who could ask for more!

After Jane...thats right Jane.... sent the IVER out on its last mission we finally decided to walk the walk after talking the talk....and go for a swim. We knew it would be cold, but as we said "How many times to you get the chance to swim in Norwegian fjord!?" It ended up being Jesse, Kevin, and Frank in the initial group. We made it look so good that Chris couldn't help but follow our lead minutes later. The water was definitely a bit chilly, but once you got used to it (AKA body went numb), all of the chill went away and the fun began. We had swim races, did flips and dives off the dock, and provided our best impersonations of the IVER itself.

Jane showing off her technical side.

Jessie leading the charge to retrieve the IVER as it made it's in to dock.

Retrieving the IVER.

Overall we had a great last day of testing. We took some great data that demonstrated fluctuating O2 levels based on the reading. Also the sun came out, the rain stopped, and we were blessed with a truly gorgeous Norwegian day.

Sunday, June 20, 2010

Day 4: Sletvik Station

Today was a big success, but its 2 am and we are tired! Enjoy some of many pictures of our adventure, more to come soon!


Kevin protects his computer from the rain as others hide in the tent!Kasper keeping a watchful eyeFrank and the IVER with the bubble wrap still wrapped around the front of it. This was before we realized that it would not be able to dive under the water with the bubble wrap on it. After we removed the bubble wrap it had enough buoyant force to bring it to the surface in the Hopvagen fjord Coiling rope Driving the IVERChecking that the epoxy kept all the water outJane helping Kasper with some tests that will record the amount of light penetrating the water at increasing depths.IVER passing by on missions Biology stuff! Preparing to test oxygen levels in a controlled enviornment

Day 3 - IVER Progress

Today we fixed the problems that we were having yesterday by soldering the serial connector to the secondary processor board. We discovered that the pins that we had re-soldered toward the end of the night, about 3:00 AM, had become bent, some broken when we were assembling the IVER. When we arrived at the Trondheim Biological Station in the morning we decided that the best way to fix the problem with the pins was to solder wires directly to the board onto the surface mount pads. This would be a temporary fix that should hold for all of the testing that we need to do here in Norway. After working with that we had lunch at TBS with a large group of people some celebrating there PhD exams finishing and other around to greet us. The food we had was pizza with some unusual flavors. One flavor that stuck out was the Mexican Pizza which had jalapenos and other spices similar to Mexican food. Another was was a pizza similar to Thai food that had peanuts and curry sauce.
After lunch we took the IVER down to the water and ballasted it before deploying it. There was some trouble when we first placed the IVER in the water because of the extra weight of the oxygen sensor it made the entire robot want to sink instead of being neutrally buoyant. To correct for this we make the IVER a life jacket out of bubble wrap which made it float to the surface. It was necessary that the IVER have a slight buoyant force upward so when the mission was over it would stay at the surface of the water. With the IVER at the correct buoyancy we ran a couple of missions at the surface of the water to see if everything was working correctly with the sensor and if the GPS locations were correct. After it was all done we packed everything up so we could go to Sletvik the next day.

Thursday, June 17, 2010

Norway Day 2: Prepare the IVER!

Today started with breakfast at the hostel. A very nice spread, we had a selection of breads and meats, unfrosted flakes and bran, and some unknown Norwegian dishes. These two dishes were a gelled substance containing carrots, peas, corn and shrimp and a liver pate which we originally thought to be a meatloaf. Once breakfast was done we all packed up and headed to TBS. This ride really reinforced the idea that Norway loves tunnels and round-abouts, tunnels sometimes last 4km long not to mention there is even a round-about in a tunnel!


After arriving at TBS around 9 we were greated by smiling faces and kaffe (coffee in Norwegian). We then went strainght into a meeting that was a plan for the rest of our stay. What we wanted to accomplish, what the biologists wanted from our data, and when we wanted to do everything. Today's goal was decided to prepare the IVER for missions by TBS on Friday. This task would include fixing anything that may have gone wrong in transit, mount and integrate the O2 sensor to the IVER, test, and ideally drive by wire or even send it off on a basic mission.

Finished with our planning, we were given a tour of the facility and were amazed by the tools available to the research center. Now ready to begin with the day's task we unload the IVER. After not seeing any problems we connected the power and gave everything an inital test, only to find the motor was not working. Inspecting the motor we thought it may have been a little stuck, so we lubed it up until it was spinning much better. We tried the motors again and still no luck. It was only then after looking even closer did we learn that the motor cable itself was broken, but this fix would have to wait until lunch was over.

For lunch we had amazing sandwhiches with the other biologists at TBS. We talked about a wide variety of things. Kevin and Jessie talked to Inga and others about what they thought "American food" was, which turned out to be pie and turkey. Another topic that got the whole group giving their own feed back was Sweden. We were right to assume that Norway was tired of having Sweden as a "big brother" and recently the tables seemed to have turned. There are now a significant amount of Swedes traveling to Norway for work. They not only work cheaper, but work full time as well. The Swedish are easily distinugished it seems not just because of the language difference but they are also much more friendly and open according to Igna. The conversation then headed to the language barrier, specifically in Iceland. After discussing how Eyjafjallajokull, the volcano that originally stopped our travel plans, is translated literally as island-glacier-mountain we learned that Iceland is very committed to preserving their native language to keep it pure. An example was given, where Norway's translation of helicopter is helikopter, Iceland named it ______ which literally means spinning house.

With lunch over, it was back to work. The motor was hooked up properly once more and that problem was solved, but more arose as Jane and Jessie left to finally pick up Frank from the airport.

Although we tried to get straight back to work when the airport team returned, we soon had a unique chance to tour the NTNU Research Vessle. This was a very nice boat that was for the universities use which we were able to get a tour of. We walked from the dry and wet lab rooms to the common area, to the helm where we were able to sit in the captains chair.

The wet lab room
The steep stairs Kevin in the captains chair
The arrival of Frank made an immediate difference. As we prepared to epoxy the O2 sensors wires through the plugs that will help keep the IVER waterproof, he saved us a long task by replacing it with a simple one. Being simple did not make the epoxy any less messy though. Very careful not to get any on our surroundings Kevin and Alex ended up getting it all over their hands as the exccess ran from the plugs. We almost had everything we needed to get the IVER running, the only problem was the epoxy needed at least an hour to dry.

Filling the plug with epoxy

Taking advantage of this wait time we decided to get dinner. Tonight's choice went back to the converstation at lunch of what American food was to Nowegians. We were going to Egon Cafe, which focused on American food. We quickly turned to the dessert and found the Hot Apple Cake which was a piece of pie with ice cream on the side. We then looked through the menu commenting on how the meal was or wasn't American. We all went with some kind of burger, but with further reading we learned that the hamburger had cheese and the burger came with a salad, but the salad was in fact the lettuce and tomatoes in the burger. With dinner done we were off too check up on the epoxy.

Dinner at Egons Cafe

Still not dry enough, we had sometime to kill before we could reassemble and test the IVER again. Alex led a crash course on how to plan missions for those who were unfaimilar with the Vector Map software. We went over how to plan the course that the IVER would follow, and then saved some basic missions to run when the IVER was ready to go. During the spare time we tried to get a program running on Kevin's computer because the graphics card on Jessie's computer wasn't up to par. There were some problems with the program not properly starting up on Kevin's computer, so we sent the creator an email asking his thoughts on the situation and we await his response.

As night falls without getting any darker, the epoxy has finally been announced dry enough to mount the crucial pieces onto the IVER. The process of hooking every thing up seemed to go smoothly as we sealed everything back into its proper place using generous amounts of sealant. The moment of truth was upon us as we turned everything on and waited for the O2 sensor to register, and sadly it did not. We found a couple of loose connections that we fixed, but after many more cycles of assembly and dismantling the IVER it became apparent that a larger problem was present. After taking a closer look at the 2 wires connecting the sensor to the IVER we discovered that one of the connectors was loose due to bent surface mounted pins. This explained the inconsistent behavior of the sensor connection. Now the question was how to fix it. We tried many different methods centered around re-soldering the pins onto the board. Below are some pictures of this process.

Taking it apart Putting it back together
Soldering at 2 am

The night was a long one and after about 4 hours of working on this problem we decided it was time for bed. The biggest issue with our approach was the fact that getting the connector to fit flushly required near machine-grade soldering precision. Which, at 2:30 in the morning, was not happening. We had a plan for morning on a new solution, but it would have to wait as we wearily made our way back to our hostile at 3:00 am as Dr. Clark sent an email to Kasper informing him we would not be back to TBS at 9:00am like originally planned.